The projects

Swifthorseman partner with the EOS team on various projects over a continuous timeframe, to supply their pod-wall product using light gauge steel frame components.

Projects include;

The Royal Courts of Justice in London

Baker Street in London

Virgin Atlantic first class lounge in Heathrow Airport

End clients are major national contractors including HBG

 

The design process

The client electronically sends detailed drawings to the EOS team, who interpret them utilising frame CAD. The system then provides semi-automated high quality and timely production.

The steel is fully engineered with service holes and joining holes ready for assembly by the client on site.

 

The benefits

This means the client can use their own joiners to assemble the frames without much training. This gives the client flexibility within their own factory, as delivery can be flat pack, part or fully assembled. Our solutions are engineered to make life easier.

'Speed of turnaround is a key benefit to light gauge steel frame. The material enables a very rigid structure. After moving from using timber to using steel we are able to appreciate that this gives us a very strong structure for hanging toilet systems and shower pods.'

Further to this the lead time for LGSF is no more than 7 days. We moved away from timber 3 years ago due to the speed of construction we can gain with light gauge steel frame.

 

Our relationship

We have a very good cross party communication between companies. Nigel interacts with the factory floor, Lisa with accounts, and Steve with the director. It is a very good working relationship where we even play host to each other with evening entertainment!

 

Why EOS?

'EOS are very quick to react to problems. A key selling point is that they provide a rapid response to all our requests and place emphasis on friendly working relationships.

After considering working with timber, we chose to work with light gauge steel frame. After this, choosing EOS was simpe, their service is second to none.'

 

Key Staff

'Steve Thompson is critical to our relationship; nothing is a problem for Steve! He ensures that the speed of delivery and speed of sorting out problems are turned around pretty much the next day!'

 

Future projects

We aim to continue as we have been working in the future.

“EOS speed and response to any problems raised is very fast and we work closely to quickly sort the problem out.”